Advanced power distribution platform

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12068602
SERIAL NO

17427285

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for a power distribution grid including an electrical distribution circuit includes a processor configured to perform operations including constructing a grid model comprising edges and nodes representing assets and transmission paths of the power distribution grid, generating an analysis of an operation of the power distribution grid over a predetermined time duration, determining a plurality of constraint violations based on the analysis of the operation of the power distribution grid within the predetermined time duration, generating a plurality of alterations to the power distribution grid, respective ones of the plurality of alterations resolving at least one of the constraint violations, selecting a first alteration of the plurality of alterations to the power distribution grid responsive to determining that the selected first alteration resolves at least two of the plurality of constraint violations, and autonomously implementing the first alteration to the power distribution grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DUKE ENERGY CORPORATION550 SOUTH TRYON STREET CHARLOTTE NC 28202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Belchandan, Rakesh Kumar Charlotte, US 1 3
Cardenas, Jose Martin Charlotte, US 1 3
Kling, Andrew Charlotte, US 2 14
Pressley, John Templeton Charlotte, US 1 3
Ratnayake, W R M Anuja Charlotte, US 1 3
Rendell, Gerard Charlotte, US 1 3
Richardson, Jacob A Charlotte, US 1 3
Sanda, Miguel Armando Indian Land, US 1 3
Woodall, Daniel Raleigh, US 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00