Farmland reference crop evapotranspiration prediction method considering uncertainty of meteorological factors

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12067079
SERIAL NO

17144150

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A farmland reference crop evapotranspiration prediction method based on uncertainty of meteorological factors, includes: S1. acquiring a set number of groups of weather forecast data of a prediction region within a preset time period; S2. inputting each group of weather forecast data into a Bayesian probability forecast system to obtain corrected weather forecast data; and S3. inputting each group of the corrected weather forecast data into a trained RBF neural network, and predicting to obtain a farmland reference crop evapotranspiration. In the present invention, the Bayesian probability forecast system is configured to correct the weather forecast data and eliminate uncertainty of weather forecast data to obtain the accurate reference crop evapotranspiration forecasted by the RBF neural network using these data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA INSTITUTE OF WATER RESOURCES AND HYDROPOWER RESEARCH100048 NO 20 WEST ZHUANG ROAD BEIJING HAIDIAN DISTRICT BEIJING CITY BEIJING CITY 100048

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cai, Jiabing Beijing, CN 4 1
Chen, He Beijing, CN 41 49
Du, Taisheng Beijing, CN 1 0
Han, Congying Beijing, CN 2 0
Han, Xin Beijing, CN 22 27
Li, Yinong Beijing, CN 6 10
Peng, Zhigong Beijing, CN 5 2
Wang, Yaqi Beijing, CN 22 174
Wei, Zheng Beijing, CN 90 1088
Zhang, Baozhong Beijing, CN 22 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00