Variable area flowmeter, system comprising a variable area flowmeter and an external control unit, and method for operating a variable area flowmeter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12066309
APP PUB NO 20200132525A1
SERIAL NO

16662147

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A variable area flowmeter having a float and having a display unit, the display unit includes a pointer element, the pointer element is connected directly or indirectly to the float such that the pointer element is mechanically deflected by the float during the measuring process. The variable area flowmeter that operates particularly reliably and is flexibly applicable at the same time is achieved in that the display unit comprises at least one bi-stable display which only requires an energy supply in order to modify the displayed representation and/or to restore the representation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KROHNE MESSTECHNIK GMBH47058 DUISBURG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dzieia, Colin Bochum, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00