Bearing device, spacer, and manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12066056
APP PUB NO 20230086645A1
SERIAL NO

17798830

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bearing device includes: a magnetic ring fixed to an inner ring; and a stator fixed to an outer ring so as to face magnetic ring. Magnetic ring and stator constitute a claw pole type generator. Stator includes a coil and a magnetic yoke surrounding coil. The magnetic yoke is configured by combining a first member and a second member that are magnetic bodies. First member and second member have an identical shape. Each of first member and second member has a plurality of second claws arranged in a comb shape. A plurality of first claws of first member and the plurality of second claws of second member are alternately arranged on a surface facing magnetic ring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NTN CORPORATION3-6-32 NAKANOSHIMA KITA-KU OSAKA-SHI OSAKA 5300005 ?5300005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koike, Takashi Iwata, JP 121 1327
Shibuya, Yusuke Iwata, JP 19 115
Yamaguchi, Sota Iwata, JP 39 949

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00