Biomass energy generator system
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Aug 20, 2024
Grant Date -
Mar 7, 2024
app pub date -
Sep 1, 2023
filing date -
Sep 1, 2022
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A multi-fuel microgrid class generator system includes a heat regenerative steam engine that provides a versatile power source having a clean burn using liquid fuel or biomass for generating electricity. The generator system is also capable of using wind energy and/or solar energy that is converted to heat and stored in a thermal storage unit using a heat exchange medium, such as carbon/graphite. The heat regenerative steam engine uses these various power sources to generate up to 1 megawatt of clean and cost-effective electricity.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SCHOELL HARRY | LONGVIEW TX |
International Classification(s)

- 2023 Application Filing Year
- F01K Class
- 132 Applications Filed
- 76 Patents Issued To-Date
- 57.58 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Schoell, Harry | Longview, US | 19 | 177 |
# of filed Patents : 19 Total Citations : 177 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F01K Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Feb 20, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Feb 20, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Feb 20, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
