Block for use in automated building construction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12065826
APP PUB NO 20230193625A1
SERIAL NO

18109574

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to the building industry and in particular to a block for use in automated building construction. In one aspect, the block comprises a generally cuboid body having a top and a base, a length extending between a pair of opposed ends, and a width extending between a pair of opposed sides; the body including a plurality of hollow cores extending from said top to said base, and arranged in a row between said opposed ends; wherein each core has a rectilinear cross-sectional shape; and wherein the thickness of the block between each pair of adjacent cores is at least double the thickness of the block on all other sides of each core, so that the block is divisible into a plurality of substantially identical block portions, each portion including four walls of substantially uniform wall thickness about its core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FASTBRICK IP PTY LTD122 SULTANA RD WEST HIGH WYCOMBE WA 6057 AUSTRALIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pivac, Mark Joseph Western Australia, AU 28 340

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00