Methods of controlling shutdown of reactor systems

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12065518
SERIAL NO

17309175

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Controlling the shutdown of a polyethylene reactor system that includes a secondary compressor, a reactor, a high pressure let down valve (HPLDV), a high-pressure separator, and a high-pressure recycle gas system is provided. After a partial or complete shutdown of secondary compressor, HPLDV opens to a pre-set open position until the reactor pressure reduces to either a pre-set reduced pressure limit or a until the slope of the reactor gas density to reactor pressure exceeds 0.15. The HPLDV controls the pressure to a pressure set point.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXXONMOBIL CHEMICAL PATENTS INCU S A

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clymans, Paul J Kapelle-Op-Den-Bos, BE 12 18
D'Hooghe, Philippe A P Merelbeke, BE 1 0
Dewitte, Cindy Puurs-Sint-Amands, BE 6 7
Galliano, Jefferson P Singapore, SG 1 0
Lammens, Henri A Antwerp, BE 16 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00