Use of renewable energy in methanol synthesis

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12065398
SERIAL NO

17310074

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A methanol synthesis plant comprising: a feed pretreating section operable to pretreat a feed stream; a synthesis gas (syngas) generation section comprising one or more reactors operable to produce a syngas synthesis product stream comprising synthesis gas from the feed stream; a methanol synthesis section comprising one or more methanol synthesis reactors operable to produce a synthesis product comprising methanol; and/or a methanol purification section operable to remove at least one component from the synthesis product to provide a purified methanol product; wherein the methanol synthesis plant is configured such that, relative to a conventional methanol synthesis plant, more of the net energy required by the methanol synthesis plant, the feed pretreating section, the syngas generation section, the methanol synthesis section, the methanol purification section, or a combination thereof, is provided by a non-carbon based energy source, a renewable energy source, and/or electricity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SABIC GLOBAL TECHNOLOGIES B.V.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abbott, Tim Redcar, GB 8 34
Huckman, Michael Edward Sugar Land, US 12 12
Lawson, Kenneth Francis Redcar, GB 10 12
Oprins, Arno Geleen, NL 8 28
Schroer, Joseph William Sugar Land, US 12 12
Stevenson, Scott Sugar Land, US 29 124
Ward, Andrew Mark Redcar, GB 54 435
Zhao, Zhun Sugar Land, US 10 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00