Slew drive system for aerial platform leveling

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12065336
SERIAL NO

18380510

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aerial device for operating on energized powerlines is disclosed. Embodiments of the current disclosure relate to a slew drive system for an aerial device. In some embodiments, the slew drive system provides leveling and jerk mitigation to an aerial platform of the aerial device. Various sensors may be disposed on an aerial device boom, on the slew drive, and on the aerial platform, for obtaining data indicative of a state of the aerial device. The data indicative of the state of the aerial device may be used to control the slew drive with various hydraulic valves and motors to level the aerial platform and mitigate/eliminate jerk. The systems and methods described herein provide a comfortable riding experience for aerial line workers in the aerial platform and maintain a level state of the aerial platform across a wide range of boom angles including at extreme ends of the boom assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALTEC INDUSTRIES INC2106 SOUTH RIVERSIDE ROAD SAINT JOSEPH MO 64507

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mourlam, Timothy J Shawnee, US 27 62
Naber, William Saint Joseph, US 20 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00