Control method and control device for hybrid vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12065127
APP PUB NO 20210206366A1
SERIAL NO

17273066

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid vehicle includes an internal combustion engine and a motor generator, wherein the internal combustion engine includes a variable compression ratio mechanism structured to vary in mechanical compression ratio depending on variation in position of a compression ratio control member structured to move due to driving of an electric actuator. A control method for the hybrid vehicle includes: measuring a state of charge of a battery connected to the motor generator; and in response to regenerative operation of the motor generator in a state that the state of charge of the battery is equal to or higher than a predetermined level, consuming generated electric power by driving the electric actuator of the variable compression ratio mechanism.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTDYOKOHAMA-SHI KANAGAWA 221-0023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arinaga, Tsuyoshi Kanagawa, JP 21 104
Ichihara, Hiroki Kanagawa, JP 10 0
Tojo, Tomoya Kanagawa, JP 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00