Tire

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12064998
SERIAL NO

17546918

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a tire, each of first and second circumferential grooves include groove portions arranged discontinuously in a row in a circumferential direction. The groove portions are arranged in a staggered manner in the circumferential direction. A distance D1 from an equatorial plane to a center line of the first circumferential groove and a distance D2 from the equatorial plane to a center line of the second circumferential groove satisfy 0.90≤D2/D1≤1.10. A maximum groove width W1 of the groove portion of the first circumferential groove and a maximum groove width W2 of the groove portion of the second circumferential groove satisfy 0.90≤W2/W1≤1.10. A maximum circumferential length L1 of the groove portion of the first circumferential groove and a maximum circumferential length L2 of the groove portion of the second circumferential groove satisfy 0.90≤L2/L1≤1.10.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE YOKOHAMA RUBBER CO LTDJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaneko, Takeshi Kanagawa, JP 137 529

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00