Method of preparing a material of a battery cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12064757
APP PUB NO 20240001318A1
SERIAL NO

18368391

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A continuous process for producing a material of a battery cell using a system having a mist generator, a drying chamber, one or more gas-solid separators and a reactor is provided. A mist generated from a liquid mixture of two or more metal precursor compounds in desired ratio is dried inside the drying chamber. Heated air or gas is served as the gas source for forming various gas-solid mixtures and as the energy source for reactions inside the drying chamber and the reactor. One or more gas-solid separators are used in the system to separate gas-solid mixtures from the drying chamber into solid particles mixed with the metal precursor compounds and continuously deliver the solid particles into the reactor for further reaction to obtain final solid material particles with desired crystal structure, particle size, and morphology.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Liang-Yuh Saratoga, US 187 3064

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00