Method for controlling a rotational speed of an electric tool and electric tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12062999
APP PUB NO 20210313909A1
SERIAL NO

17202473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling a rotational speed of an electric tool includes starting a motor and controlling the motor to operate at a constant speed which is a preset rotational speed in response to determining that a motor of the electric tool is in a preset low-speed mode, increasing output torque until the motor runs in response to a rotor of the motor being locked, and controlling, based on a relationship between a current rotational speed of the motor and the preset rotational speed, the motor to operate at a constant speed. In this manner, the problem where a rotor is easily locked when the electric tool runs in a low-speed mode in the related art is solved and the electric tool can adaptively adjust an output rotational speed of the motor according to the load condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING CHERVON INDUSTRY CO LTDNANJING

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fan, Baofeng Nanjing, CN 9 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00