Offset triggered cantilever actuated generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12062965
APP PUB NO 20230137951A1
SERIAL NO

17839473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plural magnet arrangement of a matrix of rows and columns having an altered magnet field alignment of a plurality of the magnets in a matrix comprising rows and columns of magnets in such a manner that there are at times a co-existing combination of changing attractive and repelling magnetic field regions all throughout the coil winding volume, reducing the counter electromotive force (voltage) during electrically connecting a load to the coil winding terminals and extends the time duration of the output voltage waveform and this is accomplished wherein the rotational torque required to rotate the centre magnet through the coil of which it is centred within is reduced.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WEPOWER TECHNOLOGIES LLCPO BOX 229 SAGAPONACK NY 11962

International Classification(s)

loading....
  • 2022 Application Filing Year
  • H02K Class
  • 2937 Applications Filed
  • 1114 Patents Issued To-Date
  • 37.93 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deak,, Sr David Head Of The Harbor, US 17 148

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • H02K Class
  • 0 % this patent is cited more than
  • 1 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges281314401 - 10020040060080010001200140016001800200022002400260028003000

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036