Static block scheduling in massively parallel software defined hardware systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12061990
APP PUB NO 20190114548A1
SERIAL NO

15786434

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments herein describe techniques for static scheduling a neural network implemented in a massively parallel hardware system. The neural network may be scheduled using three different scheduling levels referred to herein as an upper level, an intermediate level, and a lower level. In one embodiment, the upper level includes a hardware or software model of the layers in the neural network that establishes a sequential order of functions that operate concurrently in the hardware system. In the intermediate level, identical processes in the functions defined in the upper level are connected to form a systolic array or mesh and balanced data flow channels are used to minimize latency. In the lower level, a compiler can assign the operations performed by the processing elements in the systolic array to different portions of the hardware system to provide a static schedule for the neural network.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XILINX INC2100 LOGIC DRIVE SAN JOSE CALIFORNIA 95124

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Delaye, Elliott San Jose, US 37 666
Sirasao, Ashish San Jose, US 41 452
Wu, Yongjun San Jose, US 237 3233
Zejda, Jindrich Saratoga, US 35 372

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00