Connector for pipelines and method to connect the connector to a pipeline

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12060956
SERIAL NO

17293379

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector for a pipeline, in particular for conveying hydrocarbons, extends along a longitudinal axis and has a gripping portion configured to be fitted around and clamped to the outer face; a sleeve portion, which is mounted in sliding manner to the gripping portion; a metal front gasket configured to be placed between the front end face and a face of the sleeve portion; and linear actuators connected with the gripping portion and the sleeve portion to axially compress the metal front gasket between the front end face of the pipeline and the face of the sleeve portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAIPEM S P AVIA MARTIRI DI CEFALONIA 67 SAN DONATO MILANESE 20097

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guadin, Sebastiano San Donato Milanese, IT 1 0
Mattarucco, Riccardo San Donato Milanese, IT 2 0
Toso, Gianluca San Donato Milanese, IT 6 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00