Method for growth of atomic layer ribbons and nanoribbons of transition metal dichalcogenides

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12060642
APP PUB NO 20220325415A1
SERIAL NO

17853419

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making an atomic layer nanoribbon that includes forming a double atomic layer ribbon having a first monolayer and a second monolayer on a surface of the first monolayer, wherein the first monolayer and the second monolayer each contains a transition metal dichalcogenide material, oxidizing at least a portion of the first monolayer to provide an oxidized portion, and removing the oxidized portion to provide an atomic layer nanoribbon of the transition metal dichalcogenide material. Also provided are double atomic layer ribbons, double atomic layer nanoribbons, and single atomic layer nanoribbons prepared according to the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO 107-8556

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harutyunyan, Avetik R Santa Clara, US 32 242
Li, Xufan Dublin, US 15 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00