Component latch release adjustable handle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12059781
APP PUB NO 20230001550A1
SERIAL NO

17363177

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an approach to a one-handed removable component (RC) extraction, a fixed length strap and a variable length strap, based on a configurable diameter loop in the variable length strap, are attached to each other. The variable length loop passes through the RC extraction handle and encircles a RC release lever. The fixed length strap is attached to the RC extraction handle. The loop diameter is calibrated such that pulling on the fixed length strap first applies force to the variable length loop engaging the release handle, in a direction perpendicular to the applied force, without damage before transferring force to the fixed length strap to extract the RC.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cox, Aaron Sherman, US 6 48
Sassano, Camillo Durham, US 49 307
Schultz, Kevin L Raleigh, US 72 1564

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00