Platform for conveying work parts in an assembly line, and method for placing work parts on the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12059761
APP PUB NO 20220266401A1
SERIAL NO

17631241

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is a platform for conveying a plurality of work parts in a sequence of manufacturing stations, the platform being mobile and including an inclined surface, and a set of two elements, one element of the set extending along a first plane and another element of the set extending along a second plane, an intersection of the first plane with the inclined surface defining a first direction, an intersection of the second plane with the inclined surface defining a second direction, the first direction and the second direction delimiting an angular sector, so that a work part placed on the inclined surface within the angular sector is driven by its weight downwards with respect to a slope of the inclined plane towards an intersection of the first direction and the second direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBRUGGERSTRASSE 66 BADEN CH-5400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Negre, Bernard Paris, FR 12 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00