Hybrid circuit breaker, hybrid circuit breaking system, and circuit breaking method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12057693
SERIAL NO

17598416

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid circuit breaker includes a semiconductor circuit breaker, connected between a first output end of a converter of a power supply or a source branch and a first end of a damping module; a first mechanical circuit breaker, connected in parallel to the semiconductor circuit breaker, an energy absorber, connected in parallel to the semiconductor circuit breaker, and a controller coupled to the semiconductor circuit breaker and the first mechanical circuit breaker, and when a current flowing through the converter is greater than a safe current, the controller is configured to control the first mechanical circuit breaker to be disconnected, and control the semiconductor circuit breaker to be closed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS AKTIENGESELLSCHAFTMUNICH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Wei Gang Shanghai, CN 17 26
Du, Feng Shanghai, CN 46 238

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 6, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00