Methods and systems for handling control flow structures in data-parallel architectures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12056490
APP PUB NO 20240053986A1
SERIAL NO

17886795

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems and apparatus are provided for handling control flow structures in data-parallel architectures. A method includes receiving, by a processing unit (PU), a program for execution. The method further includes applying, by the PU, a branching solution to the program to obtain data on control flow structures of the program. The method further includes determining, by the PU and based at least in part on the obtained data, one or more control flow structures of the program to predicate. The method further includes applying, by the PU, predication to the one or more control flow structures of the program.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI TECHNOLOGIES CO LTDHUAWEI ADMINISTRATION BUILDING BANTIAN LONGGANG DISTRICT SHENZHEN GUANGDONG 518129

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Kevin Toronto, CA 166 1997
Zhang, Guansong Markham, CA 29 249

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 6, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00