Method for manufacturing building element with wooden frame, building element with wooden frame, and building element system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12054939
APP PUB NO 20210277652A1
SERIAL NO

17275990

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a building element with a wooden frame, the method comprising forming the frame of the element of wooden panels filling the space inside the frame with insulation material, coating the wooden panels which define the outer surfaces of the frame of the building element to be substantially air-tight, filling the space inside the frame with expanded perlite, and applying vacuum in the space inside the building element by a vacuum pump connected to the element. The invention also relates to such a building element with a wooden frame, as well as a building element system consisting of a plurality of such building elements with a wooden frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VACUUM INSULATION SOLUTIONS OYPORTIMOPOLKU 4 8 27 HELSINKI 00800

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Herranen, Pasi Helsinki, FI 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 6, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00