Photochlorination of chloroform to carbon tetrachloride

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12054444
APP PUB NO 20230202952A1
SERIAL NO

18111590

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing carbon tetrachloride, the method comprising the step of reacting chlorine with chloroform in the presence of electromagnetic radiation within a reaction mixture that includes the chlorine, the chloroform, and carbon tetrachloride, where the concentration of chloroform is less than 5000 ppm by weight relative to the weight of the reaction mixture, where the reaction mixture includes at least stoichiometric levels of chlorine relative to chloroform, where the electromagnetic radiation creates chloride radicals, and where the reaction mixture is well mixed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OCCIDENTAL CHEMICAL CORPORATION14555 N DALLAS PARKWAY DALLAS TX 75254

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Calderwood, Brian Wichita, US 9 2
Hollis, Darrell Conway Springs, US 9 22
Klausmeyer, Rodney L Wichita, US 29 246
Kramer, Keith S Andover, US 21 28
Zeller, Robert L Seabrook, US 8 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 6, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00