System and method for monitoring a railroad grade crossing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12054185
APP PUB NO 20210061328A1
SERIAL NO

16962389

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system (200) for monitoring a railroad grade crossing (100, 250) includes an illumination device (220, 230) for illuminating a section of a railroad grade crossing (100, 250), and a control device (240) in communication with the illumination device (220, 230). The illumination device (220, 230) is configured to obtain data of the section of the railroad grade crossing (100, 250) while illuminating the section, and the control device (240) is configured to receive and evaluate the data. Further, a method (600) for monitoring a railroad grade crossing (100, 250) is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS MOBILITY INC498 SEVENTH AVENUE 16TH FLOOR NEW YORK CITY NY 10018

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corbo, Mark Prospect, US 5 9
Fritschi, Stefan Louisville, US 3 9
Goose, Stuart Berkeley, US 20 1487

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 6, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00