Suspension system for a utility vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12054082
APP PUB NO 20220355716A1
SERIAL NO

17870527

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A utility vehicle includes a frame, a first ground-engaging element coupled to a first portion of the frame, a second ground-engaging element coupled to a second portion of the frame, an operator platform supported by the frame, and a suspension system coupled between the operator platform and the frame to accommodate motion of the frame relative to the operator platform. The suspension system includes a first linkage assembly coupled to the operator platform and operable to accommodate motion of the second portion of the frame relative to the operator platform and a second linkage assembly having a first end coupled to the frame to secure the suspension system to the frame and a second end coupled to the first linkage assembly. The second linkage assembly being operable independent of the first linkage assembly to accommodate motion of the first portion of the frame relative to the operator platform.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARIENS COMPANY655 WEST RYAN STREET BRILLION WI 54110

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berchem, Jeffrey M New Holstein, US 4 9
Berglund, Brent P Brillion, US 18 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 6, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00