Seed treater

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12052942
SERIAL NO

17290176

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A seed treater having upper and lower ends includes a mixing bowl. The mixing bowl includes a stator having an annular upper inner surface defining an upper portion of the open interior of the mixing bowl, and a rotor defining a lower portion of the open interior of the mixing bowl. An air duct is fluidly connected to the mixing bowl and is configured to be fluidly connected to an air mover. The air duct includes a duct outlet configured to direct forced air from the air mover into the upper portion of the open interior defined by the upper stator to direct the seeds flowing in the upper portion of the interior of the mixing bowl inward toward a generally vertical axis of the mixing bowl as the lower rotor rotates relative to the upper stator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MONSANTO TECHNOLOGY LLC800 NORTH LINDBERGH BOULEVARD ST LOUIS MO 63167

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brewer, Damien Dardenne Prairie, US 3 17
Makadia, Vallabh St. Louis, US 15 228
Seyer, Daniel J Ballwin, US 3 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 6, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00