Pulse width signal overlap compensation techniques

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12052039
SERIAL NO

17408225

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pulse signal compensation circuit of a pulse generator can include a pulse measurement circuit and a compensation generator circuit. The pulse measurement circuit can be configured to receive a plurality of pulse signals and to generate an average duty cycle or pulse overlap signal proportional to the duty cycle or pulse overlap of the plurality of pulses. The compensation generator circuit can be configured to receive the average duty cycle or pulse overlap signal and generate a duty cycle or pulse overlap compensation signal based on the average duty cycle or pulse overlap signal. The compensation signal can be utilized to adjust the duty cycle, amount of positive or negative pulse width overlap, and or the like of the plurality of pulse signals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADESTO TECHNOLOGIES CORPORATIONSANTA CLARA CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
O'Sullivan, Cormac Cork, IE 3 2
Zhou, Shiyu Cork, IE 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00