Voltage source converter based high voltage direct current (VSC-HVDC) high-frequency resonance suppression method, system, and device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12051902
APP PUB NO 20230187940A1
SERIAL NO

18105843

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a voltage source converter based high voltage direct current (VSC-HVDC) high-frequency resonance suppression method, system, and device. The method includes: when an effective value of an actually input alternating current (AC) voltage is reduced from a normal value to meet a preset condition, making the virtual electrical quantity completely equal to the actual electrical quantity, and performing full real-time tracking for the actual electrical quantity to improve dynamic characteristics of a power system at the moment of a fault; and after performing the full tracking for a period of time, if the effective value of the actual AC voltage is less than a preset threshold, performing adaptive tracking until the actual electrical quantity recovers to a stable value. The present disclosure can reduce a risk of high-frequency resonance of a VSC-HVDC, avoid deteriorating dynamic characteristics of the VSC-HVDC, and improve safety of fault ride-through of the VSC-HVDC.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRIC POWER RESEARCH INSTITUTE CHINA SOUTHERN POWER GRIDNO 11 KEXIANG ROAD SCIENCE PARK HUANGPU DISTRICT GUANGZHOU GUANGDONG 510663 510663

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Weihuang Guangdong, CN 3 0
Li, Guiyuan Guangdong, CN 5 7
Li, Yan Guangdong, CN 1447 20982
Rao, Hong Guangdong, CN 8 16
Xu, Shukai Guangdong, CN 9 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00