Imaging system and method of manufacturing a metalens array

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12050327
APP PUB NO 20200393599A1
SERIAL NO

16537326

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An imaging system and a method of manufacturing a metalens array is provided. The imaging system includes a metalens array, and light scattered from an object is split by the metalens array, such that an image is formed in front of an observer. The metalens array is at least partially transparent to visible light, so that the observer can also see the environment. The method of manufacturing the metalens array includes bonding together a plurality of substrates, and dicing the plurality of substrates into metalens arrays. The metalens arrays can be used in the imaging system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLIED MATERIALS INC3050 BOWERS AVENUE SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fu, Jinxin Fremont, US 63 45
Godet, Ludovic Sunnyvale, US 327 3246
McMillan, Wayne San Jose, US 33 230
Roy, Tapashree Bangalore, IN 19 63
Visser, Robert J Menlo Park, US 6 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00