Methods and apparatus for coordination of network traffic between wireless network devices and computing platforms

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12047814
APP PUB NO 20200359265A1
SERIAL NO

16937270

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, apparatus, systems, and articles of manufacture are disclosed that coordinate network traffic between a wireless network device and a computing platform. An example apparatus includes a wake-up selector to generate a target wait time parameter based on a workload type of a number of packets obtained from a network device and a user preference, the target wait time parameter indicative of a time interval that, when met, causes a modem to retrieve the number of packets, a data frame generator to generate a data frame that causes the network device to buffer the number of packets for the time interval, and a network packet controller to negotiate, using the data frame, the target wait time parameter with a network device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Azizi, Shahrnaz Cupertino, US 226 3433
Balaban, Nir Yizhak Kfar Netter, IL 4 1
Balakrishnan, Ravikumar Beaverton, US 37 267
Gupta, Ajay Portland, US 233 4450
Rom, Leor Haifa, IL 10 12
Udhayan, Venkateshan Hillsboro, US 14 30
Wadaa, Ashraf H Beaverton, US 8 10
Zeira, Ariela Encinitas, US 248 2932

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00