Integrated detonator sensors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12044516
APP PUB NO 20230072419A1
SERIAL NO

17797807

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A detonator includes a substrate, a controller mounted to the substrate, and a sensor coupled to the controller to measure a temperature, pressure, acceleration or other environmental parameter of the detonator. The controller is configured to transmit the measured environmental parameter from the detonator to a remote master controller, execute an action in response to a value of the measured environmental parameter, and/or prevent or modify at least one detonator function in response to the value of the measured environmental parameter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AUSTIN STAR DETONATOR COMPANY25800 SCIENCE PARK DRIVE CLEVELAND OH 44122

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harders, Walter Jacob Rocky River, US 2 0
Howe, Larry S Norwalk, US 12 80
Rathbun, John David Hunting Valley, US 3 1
Teowee, Gimtong Westlake Village, US 45 2426

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00