Refractory anchors and eye-mounts
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jul 23, 2024
Grant Date -
Sep 21, 2023
app pub date -
Jun 21, 2022
filing date -
Mar 16, 2022
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An anchoring assembly for a refractory material for a protected surface includes a V-anchor and an eye-mount. The eye-mount mounts to the protected surface, the V-anchor mounts to the eye-mount, and the refractory material is applied and anchored to the V-anchor. The eye-mount includes a through-hole, and a saddle channel in communication with the through-hole, that are configured to receive and seat the V-anchor through the through-hole and into the saddle channel with a snap-fit connection. In some embodiments, the V-anchor is seated with a tight snap-fit connection that holds the V-anchor in an upright use position, and in other embodiments the V-anchor includes a spacer that provides the tight snap-fit connection and that is removable in-situ after application of the refractory material to convert the tight snap-fit connection to a floating snap-fit connection.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
BRAND SHARED SERVICES LLC | 1325 COBB INTERNATIONAL DRIVE SUITE A-1 KENNESAW GA 30152 |
International Classification(s)

- 2022 Application Filing Year
- F23M Class
- 24 Applications Filed
- 8 Patents Issued To-Date
- 33.34 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Burton, Cody William Douglas | Edmonton, CA | 2 | 0 |
# of filed Patents : 2 Total Citations : 0 | |||
D'Oracio, De Almeida Eduardo Fernando | League City, US | 15 | 31 |
# of filed Patents : 15 Total Citations : 31 | |||
Malo, Todd Christopher | Westerose, CA | 2 | 0 |
# of filed Patents : 2 Total Citations : 0 | |||
Reynaud, Spencer Andrew | Edmonton, CA | 2 | 0 |
# of filed Patents : 2 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F23M Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Jan 23, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jan 23, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jan 23, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Aug 08, 2023 | P | Publication | |
Jul 19, 2023 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Jun 20, 2023 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Dec 14, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Nov 26, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Sep 16, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Jun 27, 2022 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MITSUBISHI POWER, LTD.;REEL/FRAME:060742/0913 Owner name: MITSUBISHI HEAVY INDUSTRIES, LTD, JAPAN Effective Date: Jun 27, 2022 |
Dec 16, 2021 | P | Published | |
Oct 15, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Feb 23, 2021 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
Jan 18, 2021 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KONAGAYOSHI, YUTA;TOYOMARU, MAKOTO;MUROYA, KENGO;AND OTHERS;REEL/FRAME:055368/0011 Owner name: MITSUBISHI POWER, LTD., JAPAN Effective Date: Jan 18, 2021 |
Nov 07, 2019 | F | Filing | |
Nov 12, 2018 | PD | Priority Date |

Matter Detail

Renewals Detail
