Knitted component with inlay plush

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12043929
APP PUB NO 20230064557A1
SERIAL NO

17900823

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A knitted component comprises plush loops created with an inlaid yarn. A first surface of the knitted component includes a first yarn formed with a first stitch sequence that includes a quantity of knit stitches and a quantity of missed stitches. The second surface includes a second yarn formed with a second stitch sequence that includes a quantity of tuck stitches and a quantity of missed stitches. A third yarn is inlaid between two needle beds knitting the first and second yarns, and while the third yarn is inlaid, tuck stitches of the second yarn created with the previous pass of the carriage are transferred from one needle bed to another. Loops formed by the third yarn are locked into place by the transferred tuck stitches. The knitted component may be incorporated into an article of footwear. A method of manufacturing the knitted component is also described herein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIKE INCONE BOWERMAN DRIVE BEAVERTON OR 97005-6453

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ellerhorst, Martin Beaverton, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00