Curable water-swelling waterstop material, waterstop steel sheet pile, waterstop steel sheet pile production method, and water-stopping method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12043739
SERIAL NO

17422597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A curable water-swelling water stop material including: 100 parts by mass of a resin component which includes 40 to 100 parts by mass of a curable resin having a hydrolysable alkoxysilyl group and 0 to 60 parts by mass of a polyether polyol; 0.3 to 25 parts by mass of an aminosilane coupling agent; 20 to 250 parts by mass of a water-absorbent resin; and 0 to 160 parts by mass of an extender pigment, in which the hydrolysable alkoxysilyl group having a structure represented by Formula (1) —X—CH2—SiR1Y(OR2)3-Y, in which X is a bonding functional group having a heteroatom with an unshared electron pair and bonding to a methylene group bonding to a silicon atom of a hydrolysable silicon group, R1 and R2 are C1-C3 alkyl groups respectively, and Y is 0, 1 or 2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON CHEMICAL PAINT CO LTDKANAGAWA 2521111

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Higashino, Takaaki Kanagawa, JP 1 4
Kato, Kenji Kanagawa, JP 319 2972

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00