Lighting system and control method using fluid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12043172
APP PUB NO 20220144167A1
SERIAL NO

17337955

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lighting system using fluid for a vehicle includes: a first flow path configured in an interior part of the vehicle, and receiving fluid stored in the vehicle and guiding a flow of fluid; a lighting part disposed inside the vehicle to radiate light toward the first flow path; and a controller for receiving state information of the vehicle, and providing the state information of the vehicle to a passenger by controlling the flow of fluid flowing through the first flow path or the lighting part according to the state information.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797
KIA CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Han Na Hwaseong-si, KR 13 2
Lee, Kyung Chan Hwaseong-si, KR 1 0
Lee, Sang Shin Suwon-si, KR 150 478
Lee, Yun Jee Seoul, KR 3 1
Song, Ji Hyun Suwon-si, KR 9 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00