Air intake assembly for vehicle, front end assembly of vehicle, and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12043107
APP PUB NO 20230294509A1
SERIAL NO

17696302

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle fender air intake assembly for a vehicle can include a central baffle configured to be mounted to a body structure of the vehicle, a central shutter mounted on the central baffle, a lower baffle configured to be mounted to the body structure, a lower shutter mounted on the lower baffle, and an upper baffle including a first side and a second side that opposes the first side. The upper baffle can terminate at the first side and the second side. The first side can include a first opening in fluid communication with the central baffle, and the second side can include a second opening in fluid communication with the central baffle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDMINATO-KU TOKYO 107-8556

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ellison, Patrick J Raymond, US 17 40
Faria, Steve Raymond, US 7 17
Futatsuhashi, Akira Raymond, US 9 33
Marshall, Stephen J Raymond, US 3 35
Marukawa, Taiga Raymond, US 17 26
Nakano, Takashi Raymond, US 350 3217
Tsuji, Keiichiro Raymond, US 20 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00