Transportable sub-critical modules disposed in intermodal transport container for power generation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12040100
SERIAL NO

17315364

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transportable nuclear power system is provided. The system includes a nuclear power generator. The nuclear power generator includes one or more fuel cartridges configured to form a critical core during a power generation operation, each of the one or more fuel cartridges containing a nuclear fuel. The nuclear power generator also includes a reactivity controller and one or more working fluid conduits, each work fluid conduit containing a working fluid circulating within each of the one or more fuel cartridges to cool the nuclear fuel and execute a thermodynamic cycle. The system also includes an Intermodal transport container including a support structure mounted inside the transport container to support at least the one or more fuel cartridges of the nuclear power generator. The one or more fuel cartridges of the nuclear power generator are contained in the transport container during the power generation operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARBON FREE HOLDINGS LLCCOLLEGE PARK MD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Filippone, Claudio College Park, US 42 217

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 16, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00