Control center for an aerial device comprising a rotatable joystick

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12038774
APP PUB NO 20190107861A1
SERIAL NO

16099497

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Control center for an aerial device, said aerial device comprising a main boom part mounted with a first end on a turret, the main boom part being inclinable around a horizontal axis in a first inclination movement, rotatable around a vertical axis in a rotation movement, and extendable and retractable along its longitudinal extension direction in a first telescopic movement, wherein the control center comprises a first joystick configured for controlling the first inclination movement by tilting the first joystick around a first control axis, controlling the rotation movement by tilting the first joystick around a second control axis perpendicular to the first control axis, and for controlling the first telescopic movement by rotating the first joystick around its stick axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IVECO MAGIRUS AG89079 ULM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Karlovic, Kristian Stuttgart, DE 2 3
Kraemer, Jens Ulm/Donau, DE 7 26
Maier, Thomas Stuttgart, DE 205 1047
Mandel, Roland Stuttgart, DE 18 33
Pomiersky, Philipp Stuttgart, DE 2 5
Schmid, Markus Stuttgart, DE 124 659

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 16, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00