Utility trailer apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12037049
SERIAL NO

17982152

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A trailer chassis having multiple wheels attached to one or more axels and a bed area. A main gate movably attached to the chassis at the rear edge portion of the bed area and being movable between elevated and lowered positions The main gate having upper and lower edge portions and left and right gate side edges. A cutout or open portion of the main gate providing a gap or recess or opening for enabling carriage of elongated articles above the load carrying area that are longer than the bed length. An auxiliary gate that is smaller than the main gate, the auxiliary gate being movable between an auxiliary gate closed position that covers the gap or recess or opening and an auxiliary gate open position that enables articles to occupy the gap or recess or opening.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFETY GATE INC450 N MOBILE STREET FAIRHOPE AL 36532

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wright, Brian Fairhope, US 40 369

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 16, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00