Method for controlling the current output of a battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12034328
APP PUB NO 20230045807A1
SERIAL NO

17786034

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method controls the current output of a battery for driving a rail vehicle. A battery actual current Ibat,ist passes via a converter to an asynchronous motor, being a drive for the vehicle. The battery actual current Ibat,ist is set by control circuits as a function of a feedforward control torque Mff and a specified torque Mtf. The feedforward control torque Mff is calculated using a transfer function Hsys(z), which maps the torque setpoint value Msoll onto the battery actual current Ibat,ist as follows: Ibat(z) Hsys(z) Msoll(z). Accordingly, a zero-point z=znmp, which lies outside the unit circle, is determined by the transfer function Hsys(z). The feedforward control torque Mff is calculated as follows: Mff(z) Ibat,neu(z)/(Hsys(z) z) where: Ibat,neu(z)=Ibat,ideal(z) Ibat,ideal(z=znmp) where: Ibat,neu[n]=Ibat,ideal[n] for all n>0, so that pole point/zero point cancellation is reached by z=znmp at the battery ideal current.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS MOBILITY GMBHOTTO-HAHN-RING 6 81739 MÜNCHEN 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoffmann, Wolfgang Erlangen, DE 42 602

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 9, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00