PVC composite material, foam board, and flooring

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12031338
APP PUB NO 20160177579A1
SERIAL NO

15056235

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polyvinyl chloride polymer (PVC) composite material is described herein. The PVC composite material includes 40-60 parts by weight of PVC, 40-60 parts by weight of calcium carbonate, 0.2-0.6 parts by weight of composite foaming agent, 3-5 parts by weight of foam regulator, 2-4 parts by weight of toughener, 0.8-1.2 parts by weight of lubricant, and 2-3 parts by weight of stabilizer. Meanwhile, the present invention provides a foam board made of the PVC composite material and flooring. The resulting PVC products have a high-strength structure and a good foaming property, bring the comfort to feet as the resilient flooring does, have a satisfied sound reduction and can be easily installed as the hard flooring could.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNILIN BVOOIGEMSTRAAT 3 WIELSBEKE 8710

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Qinghua Zhejiang Province, CN 12 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 9, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00