Integrated riparian system for on-site treatment of river/lake silt and application thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12030798
SERIAL NO

17527257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure discloses an integrated riparian system for river/lake silt on-site treatment and application thereof, belonging to the technical field of silt treatment. The integrated riparian system includes three subsystems, namely a silt ecological treatment subsystem, a siphon drainage subsystem and a silt leachate advanced treatment subsystem. The silt ecological treatment subsystem is provided with plants, fillers, an aeration pipe and a water collection pipe from top to bottom, and a vent pipe is connected to the water collection pipe. A siphon in the siphon drainage subsystem is retractable and hump-shaped. The silt leachate advanced treatment subsystem includes a first-stage ecological treatment unit upflow wetland and a second-stage ecological treatment unit surface flow wetland. According to the disclosure, dewatering and harmlessness of silt, advanced treatment of silt leachate and purification of part of river/lake water are effectively realized through transpiration and absorption of the plants, filtration and adsorption of the fillers and degradation of microorganisms.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIANGNAN UNIVERSITYNO 1800 ROAD 214122 JIANGSU LIHU BINHU DISTRICT CITY OF WUXI PROVINCE WUXI CITY JIANGSU PROVINCE 214122

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ding, Jiannan Wuxi, CN 1 0
Fu, Shanfei Wuxi, CN 1 0
Li, Yifei Wuxi, CN 20 81
Lian, Jie Wuxi, CN 69 1196
Wang, Zhenyu Wuxi, CN 189 678
Zou, Hua Wuxi, CN 37 142

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 9, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00