Crane control method, and crane

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12030752
SERIAL NO

17423356

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a crane control method whereby shaking of a load is suppressed when automatically transporting the load along a set transport path using a crane; and a crane that is controllable by this control method. The control method includes: calculating a target transport time (Ti) of a load (W), transported by a crane (1), in a section defined by two passing points adjacent in a passing order; calculating, from a distance between the passing points and the target transport time (Ti), a target speed signal of the load (W) in the section; converting a stepped target speed signal, which connects the target speed signal of the section and a target speed signal of another section adjacent to the section, to a non-stepped target speed signal using a target value filter (F); and carrying out control on the basis of the non-stepped target speed signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TADANO LTDTAKAMATSU-SHI KAGAWA 761-0185

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Minami, Yoshimasa Kagawa, JP 19 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 9, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00