Method of manufacturing wiring substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12028967
APP PUB NO 20230239998A1
SERIAL NO

18128779

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wiring substrate includes a first insulating layer with a first opening, a second insulating layer with a second opening, a high-frequency wiring layer, a first wiring layer, a second wiring layer, and a plurality of conductive pillars. The high-frequency wiring layer including a high-frequency trace is sandwiched between the first insulating layer and the second insulating layer. The first opening and the second opening expose two sides of the high-frequency trace respectively. The high-frequency trace has a smooth surface which is not covered by the first insulating layer and the second insulating layer and has the roughness ranging between 0.1 and 2 μm. The first insulating layer and the second insulating layer are all located between the first wiring layer and the second wiring layer. The conductive pillars are disposed in the second insulating layer and connected to the high-frequency trace.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AVARY HOLDING(SHENZHEN)CO LTDSHENZHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Mao-Feng Taoyuan, TW 28 57
Yang, Zhi-Hong Guangzhou, CN 9 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00