Qubit gate and producing a generalized controlled-not quantum gate

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12026586
SERIAL NO

17531652

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Preparing a metrologically-relevant entangled state includes: providing a plurality of atoms in a regular lattice, wherein each atom is in an initial quantum state of a first state in a ground state manifold; initializing a central atom in the regular lattice to a (|0+|1)/√2 state while all other atoms remain in the first state |0 as remaining atoms; and proceeding, starting with the central atom, to propagate preparation of Greenberger-Horne-Zeilinger (GHZ) states in a nonlinear progression by increasing a number of GHZ states in each iteration through the remaining atoms in a recursive manner, to produce an intermediate GHZ state, such that the intermediate GHZ state acts as an initial GHZ state for a next iteration, until a final GHZ state is formed to prepare the metrologically-relevant entangled state of the atoms.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOVERNMENT OF THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF COMMERCENATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY 100 BUREAU DRIVE MS 2200 GAITHERSBURG MD 20899

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Belyansky, Ron College Park, US 1 0
Bienias, Przemyslaw D Silver Spring, US 1 0
Gorshkov, Alexey Vyacheslavovich Rockville, US 8 0
Kaufman, Adam Micah Boulder, US 1 0
Young, Jeremy Thomas Broomfield, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00