Composite substrate for electro-optic element and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12025864
SERIAL NO

17480870

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite substrate for an electro-optic element is disclosed. The composite substrate includes: an electro-optic crystal substrate having an electro-optic effect; a low-refractive-index layer being in contact with the electro-optic crystal substrate and having a lower refractive index than the electro-optical crystal substrate; and a support substrate bonded to the low-refractive-index layer at least via a bonding layer. A plurality of interfaces located between the low-refractive-index layer and the support substrate includes at least one rough interface having a roughness that is larger than a roughness of an interface between the electro-optic crystal substrate and the low-refractive-index layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NGK INSULATORS LTDNAGOYA-CITY AICHI 467-8530

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kondo, Jungo Miyoshi, JP 115 608
Tai, Tomoyoshi Inazawa, JP 57 806
Uno, Yudai Nagoya, JP 19 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00