Electric pump

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12025124
APP PUB NO 20220307499A1
SERIAL NO

17697928

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric pump includes a motor unit rotationally driving a drive shaft, and a pump unit. The pump unit includes a pump rotor that sends the fluid by a driving force of the driving shaft, and a pump housing that covers at least one side of the pump rotor. The pump housing includes an attachment surface extending in the axial direction and in contact with an attached body, first and second flow paths respectively on the suction side and the discharge side, and a partition wall positioned between pump-side openings of the first flow path and the second flow path facing the pump rotor, and extends in a direction along the attachment surface, and locations of attachment-side openings of the first flow path and the second flow path on the attachment surface are displaced from each other on the attachment surface in the axial direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIDEC TOSOK CORPORATIONKANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tam, Nguyen Thi Thanh Kanagawa, JP 3 5
Wu, Nan Kanagawa, JP 196 805

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00