Power generation system and method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12025107
SERIAL NO

18496853

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system to generate power, the system comprising a shaft configured for one-directional rotation around a horizontal axis, an inertial object coupled to the shaft where the inertial object has an uneven distribution of mass around the shaft, an electric generator configured to extract rotational kinetic energy from the shaft, and an electric motor configured to provide restorative energy to the shaft. The power generation method comprises steps of providing a power generation system, placing the shaft in an initial position, and inducing shaft rotation. Once shaft rotation is induced, the method alternates between steps of power generation and power consumption. More power is generated than consumed, resulting in a surplus of power supplied to the grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHAH SYEDLEDUC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shah, Syed Leduc, CA 11 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00