Thermal energy storage with fluid flow insulation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12025033
APP PUB NO 20230184140A1
SERIAL NO

18068431

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thermal energy storage system with fluid flow insulation, the system including heated thermal storage blocks positioned within a housing, and a method for operating the thermal energy storage system, including providing a flow of fluid into the housing, the fluid convectively extracting heat from a top region, a side region and a bottom region of the thermal energy storage system, to generate heated fluid that insulates the thermal storage blocks from the housing and a foundation of the thermal energy storage system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RONDO ENERGY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferhani, Yusef Desjardins Menlo, US 46 33
Jonemann, Matthieu Redwood City, US 41 86
Keller, Jeremy Quentin Seattle, US 30 32
O'Donnell, John Setel Oakland, US 69 462
Ratz, Robert San Jose, US 36 33
Treynor, Chiaki Berkeley, US 45 70
von, Behrens Peter Emery Oakland, US 82 776

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00