Equipment for riverway model manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12024838
APP PUB NO 20220307212A1
SERIAL NO

17518886

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides equipment for riverway model manufacturing, including a framework assembly, a supply assembly, a rail driving assembly, a detection assembly, and a control device. A pipe chain conveyor is used to transport model sand into a second rail; topographic data corresponding to a riverway is input into a controller; the controller controls, according to the topographic data, a driving assembly and a supply assembly to discharge a material; meanwhile, a compaction device compacts the model sand; a detection assembly detects a height of the riverway model in real time; and after a predetermined height is achieved, manufacturing of next topography is performed. The problems that the current riverway model manufacturing has high labor cost, the model manufacturing is laborious, and the working intensity is high are solved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHANGJIANG RIVER SCIENTIFIC RESEARCH INSTITUTE OF CHANGJIANG WATER RESOURCES COMMISSIONWUHAN HUBEI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Juanjuan Wuhan, CN 1 0
Hao, Jieyu Wuhan, CN 1 0
Li, Huiyun Wuhan, CN 7 1
Qu, Geng Wuhan, CN 1 0
Yao, Shiming Wuhan, CN 3 2
Yin, Dacong Wuhan, CN 2 0
Yin, Zhengxing Wuhan, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00